Week 15 | 2026

  • Drag to move — grab a schedule and slide it left or right to change when it starts
  • Resize — drag the start or end edge of a schedule to adjust its duration
  • Edit restrictions — running schedules have their start time locked; completed schedules cannot be edited
  • Colour legend — a legend above the chart shows what each bar colour means
  • Order type badges — each production schedule shows its type (FQ, FE, FQE, C) and start/end mode (ASE, AS, AE, M)
  • Hover for details — in the schedule detail header, hover over start or end times to see all times. Hover over order type or start/end mode badges to see their full descriptions
  • Continuous schedules — now extend to the right edge of the visible time range

Note - Exact behaviour varies by schedule type. For full details see here

Gantt chart with drag and drop